Picking up your mobile
- Survey the unit exterior checking for leaks, hazards or defects.
- Enter the trailer
- Check that the system / trailer is functioning normally
- HVAC systems operational
- Gantry / Magnet is functioning normally
- (MRI) make sure cold head is running.
- Secure loose items
- Close cabinets and doors
- Secure Tech chairs
- Check that the Camera is tied down (If applicable)
- Exit and secure the exterior door.
- Check that the system / trailer is functioning normally
- NOTE – The door may be left open to grant access to power controls if they are located inside the unit.
- Remove and stow rails, stairs and lift
- Raise or lower front of trailer to properly connect to tractor.
- Connect tractor to trailer to tractor and hook up electrical and air connections.
- Raise the landing gear completely
- Check generator (oil, water, fan belts and fuel) – Start Generator
- Switch unit from “Shore” power to “Generator” Power
- Unplug and store power cord, phone cord(s) and data cables.
- Raise the rear of the trailer and stow supports.
- Store any remaining blocking and / or supports
- Close all belly compartment doors
- Walk around unit making sure it is ready for transport
- Carefully exit facility making sure to avoid trees and steep driveways (High Center)
Upon Delivery of your mobile Unit
- System will be parked in the designated location
- Level the rear of the trailer (Left to right)
- Lower landing gear on the front of the trailer and raise enough to safely remove the tractor.
- Set trailer brakes, unhook airlines and electrical connection. Pull pin and slowly disconnect tractor from trailer.
- Level front of trailer (Front to Back) NOTE: The front of the trailer must come to level on the upstroke of the hydraulics. Failure to level the unit correctly can cause issues with the trailer.
- Remove power cord from belly compartment and plug into the shore power outlet provided. (Note this may be a stand-by generator.)
- Turn the power on at the source
- Switch the trailer from “Generator” to “Shore”
- Set up the stairs, Patient lift and guard rails
- Enter the trailer
- Check that the system / trailer is functioning normally
- HVAC systems operational
- Gantry / Magnet is functioning normally
- (MRI) make sure cold head is running.
- Check that the system / trailer is functioning normally
- Restore the chairs and other items to their normal locations
- Make sure phone / fax is operational
- Survey the unit exterior checking for leaks, hazards or defects.